Actualités

Afficher l'aperçu des nouvelles

Solvo.WMS implementation at the ZAO “MPP ‘Phart’” warehouse complex

11.03.2014

SOLVO completes yet another Solvo.WMS implementation project at a production warehouse.

The warehouse complex automation solution specifically tailored for production was developed by SOLVO and can essentially be termed as out-of-the-box. During Solvo.WMS development and implementation at production warehouses across various industries (the company portfolio includes over 25 such projects), SOLVO specialists had the chance to carefully study all business-processes, which allows implementation to be completed in the shortest amount of time possible.

An example of such a project is the implementation of Solvo.WMS at the warehouse complex of ZAO “MPP ‘Phart’” – a leader on the Russian soil and natural organic fertilizer market. The project was developed and implemented in record time without additional modification. Implementation at the warehouse took just 1 month to complete.

The facilities earmarked for process automation included three stand-alone warehouses (total area – 1000 m3) along with an adjacent outdoor territory (approx. 9000 m3). The warehouse complex is used for storing pallets received from the six enterprise production lines. The products are received by pallet in the Solvo.WMS, while shipping is carried out by pallet as well as carton. The plant manufactures products made to order. For these cases, the system is equipped with the cross-docking function. Solvo.WMS is integrated with the 1C host system: Enterprise 8.



Further information that could be interesting:
Pour assurer le bon fonctionnement de ce site, nous devons parfois enregistrer de petits fichiers de données sur l'équipement de nos utilisateurs. Données confidentielles